Chester Ronning Replacement School

Owner

Battle River School Division

Structural

Protostatix

Mechanical

Smith + Andersen

Electrical

SMP Engineering

Civil

Arrow Engineering

Landscaping

Design North Landscape

Sustainability

Element Sustainable Design Consulting

Photographer

Jim Dobie

Category
Education
About This Project

In January 2019 BR2 Architecture was retained by Alberta Infrastructure to design and administer the delivery of the proposed Chester Ronning Replacement School.

 

The proposed school is designed to accommodate 350 students in the core school with a full build-out to 400 students once the future two modular classrooms are added. The school will be 3,250 m2 and will accommodate the connection and integration of the future francophone school, by designing for future expansion of the gymnasium and library and the direct connection to the Chester Ronning School flex space.

 

This school is to be designed to achieve a minimum standard of LEED® V4 Silver Certification.